Balcony repairs are not so complex that they must be entrusted only to professionals. They are essentially identical to standard room renovations, with only minor differences due to structural specifics (instead of one wall – a parapet). If you treat this wall as a single large window opening, the process can be reduced to the steps described below.

Demolition and preparation

Old cladding or sheathing is removed, and all unnecessary structures are dismantled. If the parapet is made of brick, the situation is simplified: you need to prepare material for reinforcement, then level the base by removing protrusions and steps. Alternative: you can level the platform with a layer of cement mortar.

All existing defects on floor, wall, and ceiling surfaces are repaired as needed using mortars or putties, depending on the extent of crack opening and presence of depressions or voids. Then, debris, dust, and dirt are cleared away – and you can begin actual renovation.

Glazing

Start with installing one or more glazing units, depending on your chosen configuration. In some cases, the parapet rises to the floor slab on both sides, creating a solid section of the balcony that can be used as a walk-in closet, storage, or simply a relaxation zone.

The parapet must be reinforced and strengthened, even if you are installing cold glazing. This will later help during insulation and allows for mounting large windows with heavy glazing units, as well as hanging shelves, small tables, or cabinets.

It's unlikely you’ll order wooden frames for a balcony, and installing plastic profiles in the opening is well-known and tested. The key is to maintain strict lines, vertical and horizontal alignment, secure the profile to walls, parapet, and ceiling at intervals of 40–60 cm between adjacent anchors (screws), and seal all joints and connections between plastic and surfaces.

Lighting and utilities

It’s very timely to run wiring or install heating pipes now, before finishing work begins. In construction, these are known as hidden works – precisely because they become invisible after cladding installation. You don’t need to leave wires, ventilation channels, or split-system tubing exposed.

Overhead lighting on the balcony is not essential; installing a couple of fluorescent lamps on the wall or hanging wall sconces with daylight lamps will suffice. The key is to use proper electrical cables with good insulation, not thin wires.

Cables must be secured every 40–50 cm. When passing through metal frames, each section must be additionally insulated (inserted into a dielectric tube). A 4 mm² cross-section is sufficient for lighting fixtures; for power outlets, it depends on what you plan to connect. Eight mm² will be enough for simultaneously using an electric kettle and soldering iron.

Insulation and waterproofing

Performed using appropriate materials, preferably purchased in a set. Modern mineral insulators are available in convenient panels that are very easy to install into the future finishing framework. Panels are cut to the size of the framework’s cells, then tightly inserted and secured to walls, ceiling, or floor.

Waterproofing should be applied to all surfaces, as condensation may form on external walls and ceilings, not just on the floor. This can be film or special mastic, chosen according to technical specifications (read application instructions).

For ceilings and walls, as well as for the parapet, the insulation scheme is the same, even if you install a suspended ceiling. Panels are still cut and tightly laid. If no framework exists, they are fixed directly to the base using large plastic-headed dowels. Cladding is installed over them. Waterproofing is done first.

If you install a thick concrete screed, you don’t need to insulate the floor – the slab and concrete layer alone are sufficient to retain heat. For wooden flooring, insulation layers are placed between joists, beneath boards, laminate, parquet panels, and other floor coverings.

Finishing works

Here, all the cards are in your hands, the whole deck. The choice of finishing materials determines the entire process.

Avoid moisture-sensitive finishes on balconies. This includes standard wallpaper, some types of MDF and chipboard, and fabric coverings (even if you want to turn the balcony into a premium relaxation room). Humidity will remain high, especially during prolonged rainy weather.

Highly recommended for heating a balcony: modern underfloor heating systems or new infrared film, which can be installed on walls and even ceilings. Installing radiators is more expensive, and in centralized heating systems, you must submit a project and visit authorities, hoping for approval. Either water-based or electric underfloor heating is sufficient to maintain comfortable indoor temperatures.