How to Install a Self-Leveling Floor
The main purpose of a self-leveling floor—also its key advantage—is creating a perfectly flat surface. It's a self-leveling compound, but if installation rules aren't followed, all its benefits can be lost. That's why it's essential to know the basic guidelines for mixing and applying a self-leveling floor.
Preparation
Self-leveling floors can be applied on any solid base (strength of at least 150 kg/cm²). This includes concrete, cement screed, gypsum, or anhydrite substrates. Proper base preparation is critical before pouring the mixed solution.
- If there are significant height differences, the rough floor must be leveled. If differences are less than 2–3 mm, leveling is not required.
- Extreme care must be taken to clean the base from all layers, dirt, plaster, and debris. Cracks should be cleaned, widened, and sealed with cement mortar.
- Apply deep-penetration primer to the base.
- Seal all openings leading from the room with profile strips.
- Install expansion (damp-proof) tape along the room’s perimeter. This prevents moisture from being absorbed by walls, which could otherwise cause cracks in the floor near the walls.
- Mark guide lines on the walls to ensure the final floor is level. These can be done using a spirit level or laser level. This step is optional since the mixture self-levels, but it helps reduce material usage.
Mixing and Pouring the Compound
Prepare the mixture according to the manufacturer’s instructions (recipe) in a large container with high walls. It’s crucial to follow the correct proportions, as excess water can cause cracks, separation, or weakness during drying.
Use a construction mixer to blend the solution—manual mixing is acceptable but must ensure no dry lumps remain. Mixing typically takes 5–7 minutes. You may pause briefly to help release trapped air bubbles. The mixed solution must be used immediately.
Pour the first batch into the farthest point from the exit. Subsequent batches should follow closely, filling the room gradually toward the exit. Level each poured batch immediately using a metal trowel or wide spatula to fill all corners and voids.
After spreading, roll the surface with a special notched roller. This removes air bubbles. Failure to do so may result in surface deformation.
Complete the pour in one continuous session, as the compound hardens quickly. The time between pours should not exceed 10–12 minutes. Overlap joints should be mixed thoroughly. Avoid walking on the wet surface—if absolutely necessary, wear special spike inserts on footwear.
You can walk on the floor after 24 hours. Full curing time ranges from 2 to 4 days, depending on layer thickness. Once cured, use a utility knife to trim excess edges of the expansion tape. You may begin installing the final floor covering after 5–7 days.
IMPORTANT! During drying, avoid drafts and direct sunlight.