Ceiling Plastering
A flat and properly plastered ceiling is key to successful interior finishing. The ceiling plastering technique is almost identical to that used on walls.
The difference lies in the fact that ceilings are plastered without setting guides, and after smoothing the plastered surface, it is scored along the entire perimeter using a special saw called a 'shthukzhege'. This step is performed to prevent cracks at the junction between the ceiling and walls.
The quality of ceiling plastering largely depends on the preparation of the base, the materials used, and the expertise of the workers performing the plastering.
Let's examine the main aspects to consider when carrying out ceiling plastering.
Materials and Tools Used in Plastering Work
The following items are needed for the job:
- dry mix for plastering and spackling,
- liquid for mixing the plaster solution,
- container for the plaster mix,
- special construction mixer for mixing solutions,
- set of narrow and wide trowels,
- metal brush and float,
- metal screed about 50 centimeters long,
- rubber-base float,
- roller or wide brush for applying primer.
Preparatory Work
Before directly plastering the ceiling, several surface preparation tasks must be carried out to ensure proper adhesion of the plaster. First, the ceiling surface should be thoroughly cleaned of dust, dirt, and leftover plaster residue.
Next, the ceiling surface should be made more textured using a special metal brush, and then treated with a primer solution. This significantly improves adhesion between the concrete base and the plaster layer.
The next step involves filling holes, chips, and irregularities on the ceiling surface using a small trowel. If irregularities require a plaster layer thicker than one centimeter, a layer of plastering mesh (reinforcing mesh) should be attached to the ceiling. It can be secured using PVA glue or self-adhesive backing.
Plaster Application
Using a trowel, plaster mix is applied onto a screed and then evenly spread across the ceiling surface. Try to apply the mix as thinly as possible—thinner layers adhere better to the ceiling.
If ceiling irregularities are deep, surface leveling should be done in stages, applying several thin layers of plaster, each of which must be primed before applying the next. The optimal number of leveling layers is 2–3 (one layer of plaster and one of spackling, or two layers of plaster and one of spackling). Otherwise, there is a risk that the plaster layer may crack, delaminate, or start peeling off.
After the plaster has dried, the ceiling surface is sanded with a float and lightly moistened. Then, the plastered surface is worked with a rubber-base float and smoothed to a final finish.
After all work is completed, the room should be well-ventilated to ensure proper and complete drying of the plastered ceiling.