Tiling in the Bathroom — REMONTNIK.PRO

Tiling in the Bathroom

REMONTNIK.PRO · Updated: · Translated from Russian
Share:
This page is also available in the following languages:🇷🇺🇺🇦🇫🇷🇩🇪🇪🇸🇵🇱🇨🇳🇮🇳🇯🇵
Wall, floor, and sometimes ceiling tiling with ceramic tiles is the most popular type of bathroom finishing. Often, professionals are hired to perform this task. However, if there is a 'home handyman' in the family who has already mastered other renovation tasks, tiling in the bathroom can be done independently.

Surface Preparation for Tiling

The first step before tiling is preparing the surfaces (walls, floor) for ceramic tile installation.

Option one – tiling over existing surface. Advantage: all work will be done on a perfectly flat surface, greatly simplifying the installation process. Disadvantage: restoration work is required: remove broken or cracked tiles; identify areas where old tiles don’t adhere well, then remove those sections; fill any resulting gaps with plaster.

Option two – tiling on a previously cleaned surface without old tiles. In this case, old tiles are removed using a pry bar. If tiles are firmly attached, they must be broken apart and each piece carefully removed. Then, remove leftover adhesive residue from walls with a trowel or scraper, sand and prime the surface with deep-penetration primer.

If walls were painted, make small notches in the paint before tiling – this helps adhesive bond better. Leveling surfaces for tiling is easiest using a rough guide strip attached directly to the old surface. If deviation from level is minor, you may skip leveling and use only antibacterial primer.

After walls (floor) are leveled with cement-based plaster, primed, and all corners adjusted to 90°, you can begin installing new tiles. Installation usually starts with floor tiles, but for experienced DIYers, the order is not critical.

How to Lay Tiles in the Bathroom: Walls

The quality of the entire tiling job depends on how even the first row of tiles is laid. Wall layout is guided by markings. Start from the lower-left corner, marking a point at the height corresponding to the tile’s width. Then draw a perfectly straight line using a level along the entire perimeter – it must close at the starting point, not deviate above or below the initial mark.

Next step: identify areas that will require cut tiles. These should be placed so they are not visually noticeable – near doorways, or in corners where furniture, appliances, or plumbing will later be installed. To determine these areas, perform a dry layout: lay one row of tiles along the wall from which work will begin.

The width of the cut piece should not be less than half the full tile width; very narrow strips look unattractive. If this condition cannot be met, change the layout pattern – for example, start from the center of the wall opposite the entrance, if it allows for more favorable placement of cut tiles.

After careful dry fitting and marking, begin tiling. Beginners may find it easier to use adhesive mastic, as preparing the correct consistency of tile adhesive is an art. Before installation, soak tiles in water for 10 minutes to improve bonding. However, not all tile types are suitable for soaking – confirm with the sales consultant at time of purchase.

Apply adhesive to the wall using a notched trowel. To prevent tiles from slipping, install a guide strip just below the first row, both above the floor and above the bathtub (if already installed). Use construction spacers (available in building supply stores) to adjust gap size.

Notch size on the trowel depends on tile size: smaller tiles require finer notches. Deep grooves left by the trowel are needed for large tiles to ensure better adhesion. The adhesive layer thickness also depends on tile type – typically 3–4 mm is sufficient.

Important! Do not apply adhesive to a section longer than 5–6 tiles; it dries quickly and loses effectiveness.

Install tiles by pressing firmly against the adhesive. Insert tile spacers (cross-shaped) into joints between adjacent edges to ensure even spacing. Begin by laying all full tiles according to your chosen pattern, saving cut pieces for last. You can complete these later, once most of the work is done. Cut tiles using a manual tile cutter, marking the line with a pencil.

Check each row for level using a spirit level, and correct minor deviations immediately with a trowel. Subsequent rows are laid from bottom to top, using spacers which are removed after adhesive has dried. Any excess adhesive that oozes out from under the tiles must be removed immediately, using a knife or thin trowel.

How to Lay Tiles in the Bathroom: Floor

Tiles can only be laid on a perfectly flat surface. The best option is self-leveling concrete floors. Before tiling, old concrete slabs should be primed with an antiseptic solution to prevent mold and protect against excess moisture. Then apply a waterproofing compound to protect against corrosion and excess humidity.

Use floor-grade tiles, and select adhesive accordingly. A dry layout, as with wall tiling, helps place full tiles in prominent areas, hiding cut pieces near walls, under the bathtub, or near the toilet.

After dry fitting, draw layout lines using chalk. Alternatively, use the central tile method: leave four tiles in the center of the floor after dry layout, outline the square, and begin tiling from there. Regularly check laid rows with a level to achieve a perfectly flat floor surface.

Grouting the Joints

Grouting is performed after the adhesive has fully dried, typically 24–48 hours (exact time is on the packaging). Two types of grout materials are used: cement-based and epoxy-based.

After mixing the dry powder with water in the correct proportions (as indicated on the packaging), apply grout using a rubber float to fill gaps between tiles. To distribute the grout evenly, change the direction of motion: first along the joint, then across it. After about 30 minutes, wipe the tiles carefully, before the grout fully dries – removing it afterward is difficult.

Need a renovation specialist?

Find verified professionals for any repair or construction job. Post your request and get offers from local experts.